PSL, by nature of its operations, has encountered many different shore end landing scenarios, many of which are extremely difficult to approach and do not permit open trenching.

One way of overcoming these challenges is via a Horizontal Directional Drilled Bore, avoiding many obstacles and eliminating open trenching.

PSL owns and operates Horizontal Directional Drilling units (HDD) up to 250tns thrust / pullback and is capable of performing 4” HDD installations upwards of 1000m in Length from bore entry to punch-out.

Some of advantages encountered with HDD installations include:

• Avoids Sensitive Touristic Beach Crossings
• Controlled Installation
• Minimal Environmental Footprint
• No Open Trenching