EKO SALONICA OFFSHORE LOAD / UNLOAD TANKER TERMINAL

CIS ISMF JV. 1995 – 7. Submarine sea lines; Products 10”, 16 “ and 20” – 18 km. total, Crude Oil offloading line 40”dia. – 4 km., engineering, preparation, launching, Post lay burial (2m. depth) and anchor mats protection for EKO Refinery Offshore (loading / unloading) Terminal Island Salonica Greece.

AKTIO – PREVEZA

Submarine sea lines; water 30” dia., 4 km. total, engineering, preparation, launching, Post lay burial (1.2m.depth) and anchor mats protection for Cristiani Nielsen – Aktio, Preveza Crossing.

PYLOS Prefecture waste water treatment plan

For Envitec SA Submarine pipeline installations – pre/post route survey-bathymetry survey and drawings 2003.